Checkpoint Report Checklist
Checkpoint Report Checklist
Checklist ensures a Checkpoint Report for the project is targeted and useful.
- The report clearly states the reporting period covered.
- Every product/deliverable in the Work Packages, for that period, is covered by the report.
- Includes an update on any unresolved issues from the previous report.
- The report is prepared at the frequency required by the Project Manager.
- The information is timely, useful, objective and accurate.
- The level and frequency of progress assessment is right for the stage and/or Work Package.
- The report is accessible for all project team members.
- The report does not repeat/contain dated information.